Commercial to residential conversion under Class MA in London

Class MA lets you convert offices, shops and other Class E commercial buildings in London into homes through prior approval rather than a full planning application, provided the building and the design meet a defined list of tests. We confirm eligibility, design flats that meet the space and daylight standards, coordinate the transport, noise, contamination and flood reports, and manage the 56-day determination with the council.

Indicative fee in two minutes. Written fixed-fee quote within 24 hours.

Fee model
Quoted per project
Typical timeline
3–5 working days + 2–3 weeks
Coverage
London and the Home Counties
Quote
Within 24 hours
01Who this is for

Is this the right service for your project?

  • Owners of vacant or under-let offices and shops considering residential conversion
  • Small developers and investors buying Class E buildings with residential potential
  • Landlords of upper-floor commercial space above retail parades
  • Freeholders in boroughs where an Article 4 direction may remove the Class MA right
02Scope

What's included, and what isn't

Every quote lists exactly these items. No surprises after you've signed.

What's included

  • Eligibility check against Class MA, including two-year Class E use and Article 4 directions
  • Measured survey of the existing building and site
  • Existing and proposed plans, elevations and sections for prior approval
  • Flat layouts designed to the nationally described space standard
  • Natural light assessment for every habitable room
  • Coordination of transport, noise, contamination, flood risk and daylight consultants
  • Prior approval statement and submission through the Planning Portal
  • Response to council queries within the 56-day period
  • Advice on whether external alterations need a separate planning application

Not included (we coordinate these)

  • Council prior approval fee (£250 per dwellinghouse; verify before applying)
  • Specialist consultant fees for transport, noise, contamination, flood and daylight reports
  • Planning applications for external works such as new windows, extensions or roof additions
  • Building Regulations drawings, quoted separately once prior approval is granted
  • Fire strategy and Building Safety Regulator submissions for higher-risk buildings
03Process

How it works and how long it takes

  1. Step 013–5 working days

    Eligibility review

    We check the planning history, Class E use period, Article 4 maps and any listed or conservation status, and tell you whether Class MA is available and what reports are needed.

  2. Step 022–3 weeks

    Survey and feasibility layouts

    A measured survey, then test layouts showing how many flats meet the space standard and natural light test, so you know the realistic unit count before committing.

  3. Step 033–5 weeks, in parallel

    Consultant coordination

    We brief transport, noise, contamination, flood and daylight consultants where required and integrate their findings into the design.

  4. Step 04Within 2 working days of sign-off

    Prior approval submission

    Full drawing set and statement submitted with the consultant reports. We handle validation.

  5. Step 0556 days

    56-day determination

    The council has 56 days to decide. We respond to officer queries promptly to protect the deadline.

04Fees

How our fixed fee for commercial to residential (class ma) works

One fee, agreed in writing before you commit. Answer six questions and we email you an indicative estimate for your project.

Quoted per project after a short call.

Project type and size
A rear dormer costs less to document than a mansard; a two-storey extension more than a single storey.
Property and constraints
Flats, detached houses, conservation areas and listed buildings need more drawings and a fuller planning case.
How far we take it
Planning drawings only, planning plus Building Regulations, or the full package to tender-ready details.
Indicative pricing

Class MA fees depend on the number of units, the reports needed and whether external works need a separate application. Magna Studio fees for a typical two-to-four unit conversion are quoted per building, excluding VAT, council fees and consultant reports. We quote in writing within 24 hours.

Council fees, building control fees, structural engineer, party wall surveyor and specialist reports are always separate. We list them in every quote.

Get your instant estimate

Empty offices above shops, tired retail units and small commercial buildings sit in every London borough, and Class MA of the General Permitted Development Order offers a route to convert them to homes without a full planning application. The council can only consider a fixed list of matters and must decide within 56 days. The catch is that the tests are technical, the evidence must be right first time, and in parts of central London the right has been removed.

What is Class MA and who can use it?

Class MA allows a change of use from Class E (commercial, business and service) to Class C3 dwellinghouses, subject to prior approval. The main conditions are:

  • the building has been in Class E use for at least two continuous years before the application;
  • it is not a listed building, a scheduled monument, or in an AONB, National Park, the Broads or a World Heritage Site;
  • it is not in an area covered by an Article 4 direction removing Class MA;
  • every habitable room has adequate natural light;
  • each new dwelling meets the nationally described space standard, which starts at 37 m² for a one-bed, one-person flat and 50 m² for a one-bed, two-person flat.

Until 2024 there was also a 1,500 m² floorspace cap and a three-month vacancy test; both were relaxed, and we verify the current wording for every project. The Class MA guide has more detail.

Which London boroughs have Article 4 directions against Class MA?

Several central boroughs have used Article 4 directions to protect office and town-centre floorspace. Parts of Westminster, the City of London, Camden, Islington, Tower Hamlets and Hackney are affected, typically in the Central Activities Zone and designated employment areas. Boundaries are street-specific, so check the council’s Article 4 map before you buy or commit. Where Class MA is removed, a full planning application for change of use remains possible.

What does the council assess in the 56 days?

Prior approval is not a planning application in miniature. The council may only consider:

  • transport and highways impacts, including parking and servicing;
  • contamination and flood risk;
  • noise from surrounding commercial premises affecting future residents;
  • adequate natural light to all habitable rooms;
  • the space standard;
  • in a conservation area, the impact of losing a ground-floor commercial use, and for former nurseries or health centres the local impact of that loss.

Each matter needs evidence. We coordinate the transport, acoustic, contamination and flood consultants and prepare the natural light assessment and space standard schedule ourselves.

What’s included

The eligibility review checks planning history, the two-year use test, Article 4 maps and heritage designations, and gives you a written answer before you spend money on surveys. We then survey the building, test flat layouts against the space standard and daylight requirements so you know the realistic unit count, and produce the prior approval drawing set and statement. Consultant reports are coordinated into a single submission and we handle every officer query inside the 56-day window. Our planning documentation service covers the drawing standards we work to.

What’s not included

The council’s fee is £250 per dwellinghouse (England, from 1 April 2025; verify before applying) and is paid by you. Consultant reports are quoted separately and typically add several thousand pounds. External alterations need their own planning application. Building Regulations drawings, fire strategy and any Building Safety Regulator involvement for taller buildings are quoted once prior approval is secured.

Process and timeline

Stage Typical duration
Eligibility review and quote 3–5 working days
Survey and feasibility layouts 2–3 weeks
Consultant reports (in parallel) 3–5 weeks
Prior approval drawings and statement 2–3 weeks
Submission to validation Within 2 working days of sign-off
Council determination 56 days

Consultant reports are the most common cause of slippage, so we brief them early.

Fees

Class MA projects vary too much in unit count and evidence requirements for a single band, so we quote each one individually. The fee scales with the number of units and the reports the council will expect, and the written quote itemises what each consultant is likely to cost, excluding VAT and council fees. Tell us about the building through the quote tool or the contact page and we reply with a figure within 24 hours.

Send us the address and any floor plans you have and we will confirm whether Class MA applies, estimate the unit count and quote within 24 hours. Get your instant estimate.

05Questions

Frequently asked questions

What buildings qualify for Class MA in London?

The building must have been in Class E use (commercial, business or service, which includes offices, shops, cafés, gyms and clinics) for at least two continuous years before the application. It cannot be listed, in an AONB or National Park, or in an area where an Article 4 direction has removed the right. Older summaries mention a 1,500 m² cap and a three-month vacancy test; these were relaxed in 2024, so check the current wording.

How long does Class MA prior approval take?

The council has 56 days from receipt of a valid application to decide. If it does not decide within that period and no extension has been agreed, the development can proceed. Allow a further 6–10 weeks beforehand for the survey, layouts and consultant reports, so a realistic programme from instruction to approval is around four to five months.

What does the council actually assess under Class MA?

Only the matters listed in the Order: transport and highways impact, contamination and flood risk, noise from nearby commercial premises, adequate natural light to every habitable room, and compliance with the nationally described space standard. In a conservation area it also considers the loss of a ground-floor commercial use. It cannot refuse on general design or density grounds.

Is my building in an Article 4 area that removes Class MA?

Several central London councils, including parts of Westminster, the City, Camden, Islington, Tower Hamlets and Hackney, have Article 4 directions covering key office and town-centre locations. The boundaries are specific and change, so check the council's Article 4 map or ask us to confirm it for your address as part of the eligibility review.

Can I change the windows or extend the building under Class MA?

No. Class MA covers the change of use and the works reasonably necessary to convert the building internally. New windows, new openings, extensions and roof additions need a separate planning application, which we can run alongside the prior approval so the two decisions arrive together.

06Examples

Example projects

Typical projects showing the constraints we work through and the planning route we would take.

Existing first floor plan of a vacant open-plan office above two shops in South CroydonExample project
Change of useSouth Croydon, Croydon

Office to Flats in South Croydon, Croydon

Conversion of a vacant 110 m² first-floor Class E office above two shops into two one-bedroom flats using the Class MA prior approval route in South Croydon.

Typical route: Class MA prior approval, decided within 56 days

07Guides

Read before you start

GuideUpdated Sept 2026

Class MA office-to-residential conversions in London: a practical guide

Class MA is a permitted development right that lets a Class E building (offices, shops, services) change to C3 homes through prior approval rather than full planning. The building must have been in Class E for two years and vacant for three months, floorspace is capped at 1,500 m² (verify: the rules changed in 2024), the council fee is £250 per new home and the decision period is 56 days. Prior approval tests cover transport, contamination, flooding, noise, natural light and space standards, and Article 4 directions remove the right across much of central London, so check the site before you buy.

GuideUpdated Sept 2026

How to prepare for a pre-application advice meeting with your London council

Pre-application advice is a paid, non-binding service where a planning officer reviews your proposal before you submit. Prepare a site location plan, existing and proposed sketch drawings, photographs and a one-page brief that names the policies you think apply and the questions you want answered. In London boroughs such as Camden, Islington and Richmond, a pre-app is most useful for conservation-area schemes, two-storey extensions, basements and Class MA conversions, where the officer's steer can save a refusal and a 4–6 month appeal.