Ealing · Wraparound extension · Checked 15 Sept 2026

Do I need planning permission for a wraparound extension in Ealing?

Short answer

Usually yes. A wraparound combines a side-return infill with a rear extension, and the combined footprint takes most schemes outside permitted development, so a householder planning application is the normal route. In a conservation area a wraparound always needs planning permission. Ealing has conservation areas and Article 4 directions that remove some permitted development rights, so we check the address on Ealing's constraints map before advising a route.

Get an instant estimateIndicative fee in two minutes. Written fixed-fee quote within 24 hours.

The permitted development rules for wraparound extensions

A wraparound combines a side-return infill with a rear extension. Permitted development assesses each part separately, so the side element must stay within half the width of the original house and the rear element within 3 m or 4 m, and the two together must not exceed 50 per cent of the land around the original house.

Because the combined footprint is treated as an extension wrapping the corner, most wraparounds on London terraces fall outside permitted development and need a householder planning application. A Lawful Development Certificate is worth pursuing only where each element clearly meets its own limits.

What changes in Ealing

The side element is not permitted development in a conservation area, so a wraparound there always needs planning permission, designed to the area's appraisal.

The local constraints that most often decide the route in Ealing are listed below, taken from our Ealing area page. Each one is a reason to confirm the address on Ealing's constraints map before relying on permitted development.

  • Conservation areas. Ealing has numerous conservation areas, including Brentham Garden Suburb, Bedford Park (shared with Hounslow), Ealing Common, Ealing Town Centre, Hanger Hill Garden Estate, Haven Green and Hanwell Village Green. Roof extensions are not permitted development inside them and each has a management plan officers apply. Source
  • Article 4 directions in garden suburbs and estates. Brentham Garden Suburb, Bedford Park and the Hanger Hill Garden Estate, among others, have Article 4 directions removing permitted development for external alterations, so most changes need planning permission. Check the council's constraints map for your street. Source
  • Flood risk – River Brent and Grand Union Canal. The River Brent through Hanwell, Perivale and Greenford, and the Grand Union Canal through Southall and Alperton borders, place some streets in Flood Zones 2 and 3. Ground-floor extensions there may need a flood risk statement. Source
  • Green Belt and Metropolitan Open Land. Northolt, Horsenden Hill, Perivale Park and the Brent River Park include Green Belt and Metropolitan Open Land. Plots on their edge face stricter tests for outbuildings and larger extensions. Source
  • HMO Article 4 direction. Ealing may operate an Article 4 direction requiring planning permission to convert a house into a small house in multiple occupation (HMO). We are not certain of its current extent, so confirm with the council before letting rooms. Source

What Ealing planning officers look for

Ealing officers apply the residential extensions guidance closely. Common refusal reasons are two-storey side extensions without a set-back from the front wall, rear extensions that fail the 45-degree test, and roof extensions in conservation areas that do not match the existing pattern. On the 1930s semis of Greenford and Perivale, hip-to-gable lofts and 4–6 m rear extensions are usually accepted. The council offers a paid pre-application service, which we recommend for Brentham, Bedford Park and Hanger Hill. Decisions often run past 8 weeks; allow 10–14 weeks.

Fees and timelines

The council fee for a householder application is £528 and for a Lawful Development Certificate £264 (England, from 1 April 2025; verify before applying). Both are decided within 8 weeks of validation.

Our own fee for the drawings and the application is fixed once quoted and depends on the project type, its size and the constraints above. Answer six questions in the quote tool and we email you an indicative figure within minutes, then a written fixed-fee quote within 24 hours.

02Questions

Wraparound extensions in Ealing: common questions

How deep can the rear part of a wraparound be?

Where planning permission is needed, councils usually accept about 3 m beyond the original rear wall on a terrace, and more where neighbours have already extended to that depth. The side-return element normally runs to the rear wall of the original house.

What roof works over the side return?

A pitched glazed roof falling towards the party wall keeps the wall low for the neighbour and brings light into the middle of the plan. A flat roof with rooflights is the alternative; officers assess both against the neighbour's outlook.

Do I need party wall agreements?

Almost always. The side-return wall sits on or against the party wall and the rear extension usually bears on it, so the Party Wall etc. Act 1996 applies. We draft the notices alongside the planning drawings.

How long does Ealing take to decide?

The statutory period is 8 weeks from validation for both a householder application and a Lawful Development Certificate, and 42 days for a larger home extension prior approval. Decisions often run past 8 weeks; allow 10–14 weeks.

03Examples

Example projects that face these questions

Proposed ground floor plan of a two-storey rear extension and side infill to a 1930s semi in EalingExample project
Two-storey extensionNorthfields, Ealing

Two-Storey Extension in Northfields, Ealing

Two-storey rear extension with a single-storey side infill to a 1930s semi-detached house, adding a kitchen-dining room, a fourth bedroom and a family bathroom.

Typical route: Householder planning application for both storeys in one submission

Next step

Planning a wraparound extension in Ealing?

Answer six questions and your indicative fee arrives on screen and by email. Written fixed-fee quote within 24 hours.